N E W S
2007-03-26

Systecon supports Statoil in dimensioning spares pool

Systecon has received an order from Statoil ASA, Stavanger, to optimize the spare part solution for a pool of gas turbine engines used in the oil production industry in Norway. The work is a continuation from previously performed analyses and will study the effects of an enlargement of the pool as well as other changes in the dimensioning parameters. Systecon will perform the analysis with the use of the spare part optimization tool OPUS10.

M O R E  N E W S
2008-06-05
» New Systecon Employee

2008-05-05
» New Systecon Employee

2008-04-18
» Systecon Expands!

2008-04-09
» SIMLOX VERSION 4.0 RELEASED

2008-03-25
» Systecon at Underhåll 2008

2008-01-25
» Systecon performs maintenance analysis for SJ (Swedish Rail)


« 1 2 3 4 5 6 7  »